One team from first sketch to last inspection.

Whole-life delivery

Sheet 05 / 10Projects

Featured projects.

All Projects

From brownfield to station in 38 months.

2022: the cleared brownfield site, rubble and puddles beside the old line 2025: the finished station hall with a train at the platform 2022 · Site 2025 · Station
Northgate Interchange Leeds 38 months 18 platforms rebuilt with the line open

Sheet 07 / 10Safety & Quality

Everyone home safe, every day.

Safety is planned into every drawing, not added on site.

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • 41M

    safe hours worked since 2021

  • 0.08

    lost-time injury rate, 2025

  • 100%

    of sites certified to ISO 45001

  • 12,600

    safety observations logged in 2025

58 years of building.

From one drawing office in Glasgow to 22 offices and 9,400 people.

Our Story
Engineers at their drafting boards in the old drawing office
A graduate engineer in a white helmet and hi-vis on a bridge deck, the city behind

Build a career on solid ground.

380

graduate and apprentice places a year

22 offices · one team See Open Roles

From the drawing office.

All Insights